Septic Site Evaluations Before You Build a Home in Central Kentucky

Every home in Kentucky needs a sewage disposal system, and on a lot without a sewer line the septic site evaluation comes first. The local health department, or a professional engineer, evaluates the site before a system is designed or a building permit is finished. In Garrard County, the septic soil evaluation report is one of the documents required with a new home permit application.

Buying acreage in Central Kentucky and picking a spot for the house is the fun part. The septic evaluation is the step that decides where the house can actually go. Skipping ahead to house plans before the site is evaluated is the most common way a lot purchase turns into a redesign. This guide lays out the state process in order, so the lot, the septic field and the floor plan get settled together.

Farmhouse-style home with a covered front porch and a metal roof
A farmhouse-style home with a covered front porch.

Why septic comes first on a rural lot

The Kentucky Cabinet for Health and Family Services puts it plainly in its guide for people building a house: all homes need a sewage disposal system. Where public sewer is not available, that means an on-site system, and the rules for those systems are set in the state’s administrative regulations, 902 KAR 10:085 for the system standards and 902 KAR 10:110 for the permits.

What the ground can handle decides where a septic field can go, so the evaluation is done on the site itself, by a person, before the house is drawn.

The state process, step by step

The state’s flow chart for individual home sewage systems runs in a fixed order. The table below follows it.

Step Who handles it What happens
1. Apply for a site evaluation Owner or agent, to the local health department The application starts the process. For a stick-built home, the health department issues a temporary release at this point.
2. Site evaluation Local health department or a professional engineer The site is judged approved or not approved.
3. System design and permit application Certified installer, then the local health department An approved site allows a conventional, modified, alternative or experimental system.
4. Installation inspection Local health department An initial installation inspection is scheduled and the installer’s affidavit is submitted.

Source: Kentucky Cabinet for Health and Family Services, “So, You Want to Build a House?” application and permitting process for individual home sewage systems.

One rule in 902 KAR 10:110 deserves attention: a permit from the local health department is required before an on-site sewage disposal system is installed, and the application has to be made before construction of any portion of the system begins. A trench dug before the permit is a trench that may have to be redone.

Installers are certified

The state also runs an installer certification program, set out in 902 KAR 10:140. Applications for certification go through the local health department and include proof of liability insurance. The system design layout in step 3 comes from one of these certified installers.

When a site is not approved

A site that does not pass is not always the end of the lot. The state flow chart for an unapproved site points to a discussion with the local health department about site upgrade options, a second evaluation, or consultation with Department for Public Health staff. Moving the house site on the same parcel, or evaluating a different area, are common ways forward.

The practical lesson is to evaluate before closing where the contract allows it. A parcel that looks flat and open can still have soil that limits the type of system.

How septic connects to the building permit

The two approvals feed each other. Garrard County Building Code Enforcement lists a septic system soil evaluation report as the first item on its new-home permit application, along with the property address, a typical wall section, a floor plan, a lot diagram, any deed or neighborhood restrictions, truss diagrams, and a Workers Affidavit of Assurances. The county is approved as a Level 1 program with the state Department of Housing, Buildings and Construction.

The connection shows up again at the end of the job. The City of Berea, for example, lists final septic system approval among the certificates that must be on hand at the final building inspection, next to the electrical, plumbing and insulation certificates. Septic approval is a gate at the start of the project and again at the finish.

Questions to ask the health department

  • What does the site evaluation application need? The state application is submitted by the owner or an agent to the local health department.
  • Who performs evaluations in this county? The state allows the health department or a professional engineer.
  • What does the evaluation cost and how long is the wait? Ask for the current fee and scheduling.
  • Which certified installers work in the area? The system design layout comes from a certified installer.
  • What happens if the first site is not approved? Ask about upgrade options and a second evaluation.

Frequently asked questions

Does every home need a septic system?

Every home needs a sewage disposal system. Where a public sewer is not available, that is an on-site system permitted by the local health department.

Who evaluates a site for septic?

According to the state’s guide for individual home sewage systems, the site evaluation is conducted by the local health department or a professional engineer.

Can excavation start before the septic permit?

Not for the system itself. State regulation 902 KAR 10:110 requires the permit application before construction of any portion of the on-site system, and a permit is required before installation.

Can a homeowner install their own septic system?

902 KAR 10:110 sets conditions under which a homeowner may personally perform the work, including that the work follows the state’s septic standards. The local health department confirms whether a specific project qualifies.

What if the lot does not pass the evaluation?

The state process routes an unapproved site to a conversation with the local health department about upgrade options, a second evaluation, or consultation with Department for Public Health staff.

Building on a Central Kentucky lot

Whitis Contracting is a family-owned builder that handles custom home builds, excavation and site work and land clearing across Central Kentucky, quoting a fixed price: the number you sign is the number you pay. If a lot is under contract, the construction contract questions guide and the comparison of a custom home and a production builder are useful reads before plans are drawn. To talk through a parcel near Danville, Lancaster or Harrodsburg, start with the Danville service area page.